Maximum installed capacity per REC or per individual system (DM 16-03-2025 Art. 3)

<p>The installed capacity constraint limits the maximum power output of renewable energy installations within a REC to 1 megawatt (MW) per system. This cap ensures that projects remain small-scale and community-focused, aligning with the objectives of the RED II directive and Italian energy policy. The 1 MW limit applies to each individual installation or to the total capacity of a REC, depending on the specific configuration and participation model.</p>

Link to article:

https://www.mase.gov.it/portale/documents/d/guest/20250715_allegato_1_ro_cacer_rev2dggefim_clean_final-pdf

Installed capacity ; 1 MW limit ; Renewable Energy Community ; Decreto Ministeriale 16 maggio 2025 ; RED II ; energy policy ; Italy