<p>The installed capacity constraint limits the maximum power output of renewable energy installations within a REC to 1 megawatt (MW) per system. This cap ensures that projects remain small-scale and community-focused, aligning with the objectives of the RED II directive and Italian energy policy. The 1 MW limit applies to each individual installation or to the total capacity of a REC, depending on the specific configuration and participation model.</p>
Link to article:
Installed capacity ; 1 MW limit ; Renewable Energy Community ; Decreto Ministeriale 16 maggio 2025 ; RED II ; energy policy ; Italy