KNOWLEDGE BASE
ADVANCED SEARCH
For understanding and navigating the legal frameworks that govern the creation, operation, and dissolution of ECs in Europe. This includes both regional (EU) regulations and national laws specific to each country.
KEYWORDS
<p>oGeneration unit and load are connected by a direct line or internal network.</p><p>oIf connected to the low voltage grid, the distance between the generation unit and the load must not exceed 2 km.</p><p>oIf connected to the medium voltage grid, the distance between the generation unit and the load must not exceed 4 km.</p><p>oIf connected to the high voltage grid, the distance between the generation unit and the load must not exceed 10 km.</p><p>oIf connected to the very high voltage grid, the distance between the generation unit and the load must not exceed 20 km.</p><p>oThe distances mentioned are doubled if the generation unit and the storage facilities are in low-density areas.</p>
Link to article:
https://diariodarepublica.pt/dr/detalhe/decreto-lei/99-2024-898705893
Legislation ; Proximity ; Energy Community ; Collective Self-Consumption ; DL 99/2024
Date: 24/02/2026
Please, leave a comment/suggestion: